Automatic Protein Powder Can Filling Line

From empty can to capped, sealed, scooped tub — 25 to 60 cans a minute

Your tubs are filled by hand, a scoop dropped in by hand, capped by hand. This line does all of it: cans are unscrambled, a scoop goes in, two auger heads fill them, and they’re capped, sealed and cleaned before they reach the labeler. Send us your tub before anything else — the can size decides which stations need customizing.

1. Line speed: 25 to 60 cans a minute, set by the filler

2. Scoop inserter: drops the scoop into the empty can before filling

3. Fill weight: 10 g to 5 kg, by changing the augers

4. Standard can range: Φ60–120 mm, 150–200 mm tall. Larger tubs on request

What the Line Does, Station by Station

Station 1

Can unscrambler

A Φ1,200 mm turntable lines empty cans up at up to 80 a minute.

Station 2

Desiccant inserter

Drops a desiccant into the can if your product needs one.

Station 3

Scoop inserter

Drops a scoop into each empty can, 20 to 80 a minute. A different scoop needs a different track insert.

Station 6

Capper

Screws the cap on at 50 to 100 cans a minute. Caps Φ60–100 mm.

Station 5

Neck blow-off

Blows loose powder off the rim before capping, with dust extraction, so the cap and seal land on a clean surface.

Station 4

Twin-head auger filler

Two servo augers fill two cans at a time, 25 to 60 cans a minute. A screw conveyor keeps both hoppers topped up from floor level.

Station 7

Induction sealer

Seals the foil liner under the cap, 20 to 80 cans a minute.

Station 8

Can exterior cleaner

Brushes powder off the outside of the can, 30 to 80 a minute, with its own dust collector.

Station 9

Labeller

Our APC-T1 wraps the label around the tub at 20 to 120 a minute. It runs faster than the filler, so it never holds up the line. The can exterior cleaner sits just before it, so the label goes onto a clean surface — powder on the outside of the tub is what makes a label lift.

 

The Filler Sets the Pace

Station Rate (cans/min)
Can unscrambler up to 80
Scoop inserter 20 – 80
Twin-head filler 25 – 60
Capper 50 – 100
Induction sealer 20 – 80
Can cleaner 30 – 80

Every other station runs faster than the filler, so the filler is what decides your output. Heavier fills slow it down — a 5 lb tub fills slower than a 1 lb one. Tell us your fill weight and we’ll tell you your line rate.

Will Your Tub Run on It?

In its standard build, the line runs cans Φ60 to 120 mm across and 150 to 200 mm tall. That window comes from the capper, sealer and can cleaner, which each have their own limits.

Larger tubs can be handled by customizing those stations.  The only way to know is to send us your tub and cap. We’ll check every station against it before we quote — rather than finding out when the line arrives.

Will Your Tub Run on It

What Your Plant Supplies

Power

About 11.7 kW across the line, not counting the labeller or desiccant inserter.

Compressed air

For the filler (0.6–0.8 MPa, 0.2 m³/min) and the capper (0.5–0.7 MPa, 0.5 m³/min).

Floor

Send us your room dimensions and we'll draw the line layout on your floor before you order.

Powder supply

The screw conveyor lifts powder about 2 m from a 230-liter floor hopper, 5 m³ an hour.

What changing over involves

What changed

What you adjust

Roughly

Same can, different fill weight

Set the dose on the filler

A few minutes

Different scoop

Scoop inserter track insert

15-30 Minutes

Different can size

Change parts on the capper and the filler

15-30 Minutes

Different powder

Clean the hoppers and augers

15-30 Minutes

One set of change parts ships with the filler and one with the capper. Additional scoop tracks and can-size parts are ordered to your range.

Production Applications

Protein powder tubs

Whey, plant protein and mass gainer, with a scoop in every tub.

Pre-workout and creatine

Smaller cans at the top of the speed range.

Collagen and greens

Fine powders, where neck blow-off and can cleaning matter most.

Meal replacements

Larger fills in canisters, where fill weight sets the line rate.

What to check before you buy

01

Which station sets your line speed

On a can line the filler is usually the slowest station. Ask for its rate at your fill weight, not the fastest machine on the line.

02

Whether your tub runs on every station

Each machine has its own can-size limits, and the line only runs what all of them can handle. Ask for each station's range, not just the filler's.

03

Installation and training

A full line takes longer to commission than one machine. Ask how many days, and what's included.

Why Choose AIPAK?

One Point of Contact

One project engineer handles your line from proposal to commissioning, so you’re not chasing five suppliers for one answer.

We Run Your Powder Before You Order

Send us a sample and we fill it on the machine before you order, so you see the weight spread on your own product. Tell us your smallest and largest fill and we supply the augers to cover both.

A U.S. Number, Answered by Us

+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That’s evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we’ll pick it up first thing.

Spare Parts and Lead Time, in Writing

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Protein Powder Can Filling Line FAQ

Do I have to buy the whole line?

No. The twin-head filler runs on its own, and most customers add stations as volume grows. What matters is planning the can size from the start, so every station you add later fits the same tub.

How fast is the line really?

25 to 60 cans a minute, set by the filler. Heavier fills run slower. Every other station is faster than the filler.

Will my 5 lb tub fit?

Not on the standard build — the capper, sealer and can cleaner stop at Φ120 mm across and 200 mm tall. Those stations can be customized. Send us your tub and cap and we’ll confirm before quoting.

What's the lead time?

It depends on the stations and how many need customizing. We confirm the lead time in writing in your quote, before you pay a deposit.

Does it run on US power?

Yes. We build to your local supply and confirm the voltage and frequency with your quote.

How do spare parts work?

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Customers Also Interested In...

Send us your tub, your cap and your output

The tub decides which stations need customizing. The fill weight decides the line rate. Send us both, with how many tubs a day you need, and we’ll lay the line out on your floor.

  • Direct from our factory

  • Lead time confirmed in your quote

  • Installation and training available

  • Spare parts listed in your quote

Scroll to Top