INSTALLATION & TRAINING

From Our Factory Floor to Yours

Your machine is tested on your product at our plant before it ships. Then we install it, commission it and train your operators.

U.S. line: +1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday.

FOUR STAGES

One project, one engineer from test to training

STEP 01
Factory test on your product

We run your product and your packaging at our plant. You can come and watch in person or join by video, and you sign off before the machine ships.

STEP 02
Shipping and arrival

Crated for sea freight, with a packing list and lifting points marked. You’ll know what equipment you need to unload it.

STEP 03
Installation and commissioning

Our engineer comes to your plant, sets the machine up on your floor and runs it on your product. Prefer to do it yourselves? We can guide your team through it by live video instead.

STEP 04
Operator training

Operation, changeover, cleaning and daily maintenance, on your own machine, in person or by video. Record the sessions for operators who join later.

BEFORE YOUR MACHINE ARRIVES

Five things to have ready

What ships with your machine

In the crate

A wear parts kit: seals, O-rings and the other parts you’ll replace first, listed in your quote.

A tool kit for daily adjustments and changeover.

Change parts for the formats in your order.

In the paperwork

Operating and maintenance manual in English.

Electrical and pneumatic diagrams.

Factory test record from your run.

Spare parts list with part numbers.

If your QA team needs a document we haven’t listed, ask before you order. It’s easier to add it to the package than to put it together later.

TWO WAYS TO INSTALL

On site or by video

  Engineer on site Remote video support
Best for Full lines and first-time buyers Single machines and teams who have run similar equipment
Time Depends on the machine. We confirm it in your quote. Scheduled around your team’s hours
Cost Paid by you, quoted with your order Free
QUESTIONS

What buyers ask us most

How long does installation take?

About two weeks for installation and commissioning. A single machine is often quicker. We confirm the time in your quote.

Does the engineer speak English?

Yes. The engineer who installs your machine and trains your operators works in English, on site and on video calls.

How is installation priced?

Remote video support is free. For an engineer at your plant, you cover the daily fee and travel, and we include it in your quote so you know the total before you sign.

Can we record the training?

Yes. Many customers record the training, on site or on the video call, so operators who join later can watch it.

ASK ABOUT INSTALLATION

Tell us about your site

We’ll come back with how installation and training would work for your machine.