Home » AIPAK-SP600P Stick Pack Machine | 200–300 Sticks a Minute
AIPAK-SP600P 10-Lane Stick Pack Machine
You’re paying a co-packer to fill your electrolyte sticks, or your people are doing it by hand. The SP600P runs ten lanes off a 600 mm film at 200 to 300 sticks a minute. Servo auger filling, back-seal sticks, built in our factory.
Output — 200 to 300 sticks per minute, ten lanes
Stick size — 20 to 90 mm wide, 50 to 180 mm long
Film — 600 mm, which is ten lanes at a 25 mm stick
Built in our factory | Spare parts listed in your quote | Installation about a week per machine
Is this the right machine for you?
✓ Yes, if…
- You're packing a powder supplement in single-serve sticks
- Your stick is 20 to 90 mm wide and 50 to 180 mm long
- You need 200 to 300 sticks a minute
- You run one or two stick sizes, not five
- Your powder is a drink mix, a greens blend, a protein or an electrolyte
✕ Buy something else if…
- You need fewer than 150 sticks a minute → the SP300P runs five lanes and costs less. Ask us
- You need more than 300 → the SP840P takes up to 14 lanes, though we haven't built 14 yet
- Your stick is wider than 90 mm → the SP840P goes to 100 mm
- You're packing a gel or a liquid → same platform, but a servo pump instead of an auger. Ask about the SP600L
- You want a flat four-side sachet → different machine, different page. A sachet is sealed on all four sides, which costs cycle time. For a powder drink mix we'd build you a stick
- You change stick width every day → changeover is about three hours. Two machines will cost you less than the downtime
Technical specification
| Specification | AIPAK-SP600P | What it means for you |
| Film width | 600 mm | Ten lanes at a 25 mm stick |
| Lanes | 3 – 10 | Fewer lanes for a wider stick. Ten is the maximum at 25 mm |
| Output | 200 – 300 sticks/min | Working range from production, not a peak rating. Depends on your powder and your film |
| Stick length | 50 – 180 mm | Set on the touchscreen — no parts to change |
| Stick width | 20 – 90 mm | Changing width is a three-hour job. Tell us your primary stick |
| Film per lane | About 2 × stick width, plus the back-seal lap | At a 25 mm stick, the 600 mm film gives ten lanes. That’s the arithmetic behind lane count |
| Metering | Servo auger — long, short, or short with spinner | Which auger you get depends on how your powder flows. That’s what the sample test decides |
| Sealing | Back seal (stick) | The tube forms continuously, so only the horizontal seal is intermittent. That’s why sticks run faster than four-side sachets |
| Cutting | Straight, zigzag, round corner or die-cut | Specified at order |
| Film thickness | 0.07 – 0.10 mm | Laminated film, standard for this category |
| Installed power | 5.5 kW | — |
| Frequency / Voltage | 60 Hz, 480 V or 208 V, built to your local supply | Depending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation |
| Compressed air | 0.8 MPa, 0.8 m³/min | Check your compressor covers this before you plan the installation |
| Product contact parts | 304 stainless steel standard, 316 on request | Tell us if your powder needs 316 |
| Dimensions | 1,400 × 1,800 × 2,400 mm | Add clearance for film loading and the hopper |
| Weight | 600 kg | No special foundation |
Model comparison
Model | Film width | Lanes 25 mm | Output | Best for |
|
AIPAK-SP300P | 300 mm | 5 | 100 – 150 sticks/min | Your first automated stick line — one SKU, launch or pilot volume | |
AIPAK-SP600P | 600 mm | 10 | 200 – 300 sticks/min | Medium to high-speed stick pack production | You are here |
AIPAK-SP840P | 840 mm | up to 14 | Ask us | Contract manufacturers and high-volume single products |
All three run the same back-seal format, the same stick length range and the same servo auger metering. What changes between them is film width, and film width is what sets lane count. Output ranges are from production, not peak ratings — your powder and your film move the number.
Ten lanes off one 600 mm film
A back-seal stick uses a little more than twice its width in film, because the film wraps around the product and overlaps at the back seal. At a 25 mm stick, that gives ten lanes on a 600 mm film. That arithmetic is why we ask about your stick width before we talk about output: a wider stick doesn’t slow the machine down, it costs you lanes.
Servo auger metering, three auger types
Fill weight is set by the servo auger, and we fit one of three types depending on how your powder behaves. A long auger, a short auger, or a short auger with a spinner. Which one suits your powder is not something a spec sheet answers — it’s what the sample test is for.
The tube forms continuously
A back-seal stick is a sealed tube with one seam running down the back. The tube forms continuously as film comes off the roll, so the only intermittent motion in the machine is the horizontal seal. That is the whole reason sticks run faster than four-side sachets, where every bag needs four seals and four dwell times.
Stick length on the screen, stick width on the bench
Changing stick length is a touchscreen setting — minutes. Changing stick width means changing parts and re-adjusting, about three hours for the whole machine. Worth knowing before you plan two SKUs on one machine.
Ideal Applications & Industries
Electrolyte and hydration sticks
The format the US category runs on. Single-serve, 3 to 8 g, packed 30 to a carton.
Greens and superfood blends
Fibrous and hygroscopic powders sit at the difficult end of the flowability range. This is where the sample test earns its place — the auger and the dosing timing are set against your actual powder, not against a category.
Protein and pre-workout single serves
Larger fills, wider sticks. Tell us your fill weight in grams and your stick width — those two together decide the auger and the lane count.
Creatine, amino acids and other free-flowing powders
Free-flowing powders where gravity can beat the screw and powder reaches the seal. This is the end of the range where overfill and leaking sticks come from.
Changeover
Changing stick length is a screen setting. Changing stick width is a three-hour job.
What changed | What you adjust | Roughly |
Stick length | Touchscreen setting | 15-30 Minutes |
New film roll, same size | Splice the new roll | 15-30 Minutes |
Stick width | Change the format parts, then fine-tune | About 3 hours, whole machine |
Different powder, same stick | Auger may change — depends on flowability | 15-30minutes |
So we build the machine around your primary stick, not around every stick you might run someday.
If you’re switching between two very different stick widths every day, two machines will cost you less than the downtime.
What to check before you buy
Whether anyone has run your powder
Powder fails in two directions. Too damp and it bridges in the hopper; too free-flowing and gravity beats the screw. A spec sheet won't tell you which end yours is on. Ask any supplier to run a sample before you order — and ask to see the fill weight data, not just a photo of finished sticks.
The manual
A clear English manual gets your operator running in a week. A bad one takes a month. Ask to see a sample page before you order.
Installation and training
Our engineers come to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn't free anywhere — it's either a line item or it's inside the machine price. We quote it as a line item so you can see it.
Why Choose AIPAK?
One Point of Contact
One project engineer handles your machine from proposal to commissioning, so you’re not chasing five suppliers for one answer.
We Run Your Powder Before You Order
Send us a powder sample and we’ll run it on the machine and send you the fill weight data. We sign an NDA before your sample ships. You decide whether to talk quotes after that.
A U.S. Number, Answered by Us
+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That’s evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we’ll pick it up first thing.
Spare Parts and Lead Time, in Writing
A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.
Deep Dive FAQ
That’s the right question, and we can’t answer it from a spec sheet. Powder fails in two directions — too damp and it bridges in the hopper, too free-flowing and gravity beats the screw and floods the fill. Send us a sample. We run it, adjust the auger and the dosing timing, and send you the fill weight data. NDA signed before your sample ships.
Work back from your stick width. Each lane uses about twice your stick width plus 10 mm of lap. A 25 mm stick uses about 60 mm, so a 600 mm film gives ten lanes. Tell us your stick width and your target output and we’ll tell you which film width you need.
200 to 300 sticks a minute on ten lanes, which is 20 to 30 cuts per minute per lane. That’s the working range we see in production, and it moves with your powder’s flowability and your film. We don’t publish a peak rating, because peak ratings aren’t what you’ll run.
For a powder drink mix at production volume, a stick. A stick is a sealed tube with one seam down the back — the tube forms continuously, so the machine runs fast. A sachet is sealed on all four sides, which means more seal area, more dwell time and a slower cycle. Sachets earn their place when you need the extra print area, or when you’re running a gel or a liquid.
Length is a touchscreen setting — minutes. Width is about three hours for the whole machine. If you’re switching between two very different widths every day, two machines will cost you less than the downtime.
Our engineers travel to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn’t free anywhere — it’s either a line item or it’s inside the machine price. We quote it as a line item so you can see it.
60 Hz, 480 V or 208 V, built to your local supply. Depending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation.
A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.
Yes. Our machines are certified and use certified electrical components. Because the exact scope depends on the model and electrical configuration you select, our factory confirms it in writing before production.
Customers Also Interested In...
Tell Us What You're Packing
Two of these fields is enough to get a real answer back. All of them gets you a configuration.
Not sure which model ⇢
Tell us your powder and stick size
Send us a powder sample ⇢
We'll run it and send you the data
Send your full specs ⇢
Get a line quote
- NDA signed before any sample ships.
- No sales calls — we reply by email or WhatsApp, whichever you gave us.
- Reply within one business day.