AIPAK-SP600P 10-Lane Stick Pack Machine

You’re paying a co-packer to fill your electrolyte sticks, or your people are doing it by hand. The SP600P runs ten lanes off a 600 mm film at 200 to 300 sticks a minute. Servo auger filling, back-seal sticks, built in our factory.

  • Output — 200 to 300 sticks per minute, ten lanes

  • Stick size — 20 to 90 mm wide, 50 to 180 mm long

  • Film — 600 mm, which is ten lanes at a 25 mm stick

Built in our factory        |        Spare parts listed in your quote         |        Installation about a week per machine

Is this the right machine for you?

✓ Yes, if…

✕ Buy something else if…

Technical specification

SpecificationAIPAK-SP600PWhat it means for you
Film width600 mmTen lanes at a 25 mm stick
Lanes3 – 10Fewer lanes for a wider stick. Ten is the maximum at 25 mm
Output200 – 300 sticks/minWorking range from production, not a peak rating. Depends on your powder and your film
Stick length50 – 180 mmSet on the touchscreen — no parts to change
Stick width20 – 90 mmChanging width is a three-hour job. Tell us your primary stick
Film per laneAbout 2 × stick width, plus the back-seal lapAt a 25 mm stick, the 600 mm film gives ten lanes. That’s the arithmetic behind lane count
MeteringServo auger — long, short, or short with spinnerWhich auger you get depends on how your powder flows. That’s what the sample test decides
SealingBack seal (stick)The tube forms continuously, so only the horizontal seal is intermittent. That’s why sticks run faster than four-side sachets
CuttingStraight, zigzag, round corner or die-cutSpecified at order
Film thickness0.07 – 0.10 mmLaminated film, standard for this category
Installed power5.5 kW—
Frequency / Voltage60 Hz, 480 V or 208 V, built to your local supplyDepending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation
Compressed air0.8 MPa, 0.8 m³/minCheck your compressor covers this before you plan the installation
Product contact parts304 stainless steel standard, 316 on requestTell us if your powder needs 316
Dimensions1,400 × 1,800 × 2,400 mmAdd clearance for film loading and the hopper
Weight600 kgNo special foundation

Model comparison

Model

Film width

Lanes 25 mm

Output

Best for

 

AIPAK-SP300P

300 mm

5

100 – 150 sticks/min

Your first automated stick line — one SKU, launch or pilot volume

View →

AIPAK-SP600P

600 mm

10

200 – 300 sticks/min

Medium to high-speed stick pack production

You are here

AIPAK-SP840P

840 mm

up to 14

Ask us

Contract manufacturers and high-volume single products

View →

All three run the same back-seal format, the same stick length range and the same servo auger metering. What changes between them is film width, and film width is what sets lane count. Output ranges are from production, not peak ratings — your powder and your film move the number.

Ten lanes off one 600 mm film

A back-seal stick uses a little more than twice its width in film, because the film wraps around the product and overlaps at the back seal. At a 25 mm stick, that gives ten lanes on a 600 mm film. That arithmetic is why we ask about your stick width before we talk about output: a wider stick doesn’t slow the machine down, it costs you lanes.

Servo auger metering, three auger types

Fill weight is set by the servo auger, and we fit one of three types depending on how your powder behaves. A long auger, a short auger, or a short auger with a spinner. Which one suits your powder is not something a spec sheet answers — it’s what the sample test is for.

The tube forms continuously

A back-seal stick is a sealed tube with one seam running down the back. The tube forms continuously as film comes off the roll, so the only intermittent motion in the machine is the horizontal seal. That is the whole reason sticks run faster than four-side sachets, where every bag needs four seals and four dwell times.

Stick length on the screen, stick width on the bench

Changing stick length is a touchscreen setting — minutes. Changing stick width means changing parts and re-adjusting, about three hours for the whole machine. Worth knowing before you plan two SKUs on one machine.

Ideal Applications & Industries

Electrolyte and hydration sticks

The format the US category runs on. Single-serve, 3 to 8 g, packed 30 to a carton.

Greens and superfood blends

Fibrous and hygroscopic powders sit at the difficult end of the flowability range. This is where the sample test earns its place — the auger and the dosing timing are set against your actual powder, not against a category.

Protein and pre-workout single serves

Larger fills, wider sticks. Tell us your fill weight in grams and your stick width — those two together decide the auger and the lane count.

Creatine, amino acids and other free-flowing powders

Free-flowing powders where gravity can beat the screw and powder reaches the seal. This is the end of the range where overfill and leaking sticks come from.

Changeover

Changing stick length is a screen setting. Changing stick width is a three-hour job.

What changed

What you adjust

Roughly

Stick length

Touchscreen setting

15-30 Minutes

New film roll, same size

Splice the new roll

15-30 Minutes

Stick width

Change the format parts, then fine-tune

About 3 hours, whole machine

Different powder, same stick

Auger may change — depends on flowability

15-30minutes

So we build the machine around your primary stick, not around every stick you might run someday.

If you’re switching between two very different stick widths every day, two machines will cost you less than the downtime.

What to check before you buy

01

Whether anyone has run your powder

Powder fails in two directions. Too damp and it bridges in the hopper; too free-flowing and gravity beats the screw. A spec sheet won't tell you which end yours is on. Ask any supplier to run a sample before you order — and ask to see the fill weight data, not just a photo of finished sticks.

02

The manual

A clear English manual gets your operator running in a week. A bad one takes a month. Ask to see a sample page before you order.

03

Installation and training

Our engineers come to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn't free anywhere — it's either a line item or it's inside the machine price. We quote it as a line item so you can see it.

Why Choose AIPAK?

One Point of Contact

One project engineer handles your machine from proposal to commissioning, so you’re not chasing five suppliers for one answer.

We Run Your Powder Before You Order

Send us a powder sample and we’ll run it on the machine and send you the fill weight data. We sign an NDA before your sample ships. You decide whether to talk quotes after that.

A U.S. Number, Answered by Us

+1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That’s evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we’ll pick it up first thing.

Spare Parts and Lead Time, in Writing

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Deep Dive FAQ

Can you run my powder?

That’s the right question, and we can’t answer it from a spec sheet. Powder fails in two directions — too damp and it bridges in the hopper, too free-flowing and gravity beats the screw and floods the fill. Send us a sample. We run it, adjust the auger and the dosing timing, and send you the fill weight data. NDA signed before your sample ships.

How many lanes do I need?

Work back from your stick width. Each lane uses about twice your stick width plus 10 mm of lap. A 25 mm stick uses about 60 mm, so a 600 mm film gives ten lanes. Tell us your stick width and your target output and we’ll tell you which film width you need.

How fast does it actually run?

200 to 300 sticks a minute on ten lanes, which is 20 to 30 cuts per minute per lane. That’s the working range we see in production, and it moves with your powder’s flowability and your film. We don’t publish a peak rating, because peak ratings aren’t what you’ll run.

Should I use a stick or a sachet?

For a powder drink mix at production volume, a stick. A stick is a sealed tube with one seam down the back — the tube forms continuously, so the machine runs fast. A sachet is sealed on all four sides, which means more seal area, more dwell time and a slower cycle. Sachets earn their place when you need the extra print area, or when you’re running a gel or a liquid.

How long does it take to change stick size?

Length is a touchscreen setting — minutes. Width is about three hours for the whole machine. If you’re switching between two very different widths every day, two machines will cost you less than the downtime.

Do you install the machine in the US?

Our engineers travel to your plant, about a week per machine. Travel and on-site costs are quoted separately. Installation isn’t free anywhere — it’s either a line item or it’s inside the machine price. We quote it as a line item so you can see it.

What voltage do you build to?

60 Hz, 480 V or 208 V, built to your local supply. Depending on your supply, a transformer or stabilizer may be included in the build. We confirm this with the quotation.

How do spare parts work?

A kit of wear parts ships with your machine. Every part in the kit, and the lead time for anything outside it, is listed in your quote in writing.

Do your machines meet U.S. electrical certification requirements?

Yes. Our machines are certified and use certified electrical components. Because the exact scope depends on the model and electrical configuration you select, our factory confirms it in writing before production.

Customers Also Interested In...

Tell Us What You're Packing

Two of these fields is enough to get a real answer back. All of them gets you a configuration.

Not sure which model ⇢

Tell us your powder and stick size

Send us a powder sample ⇢

We'll run it and send you the data

Send your full specs ⇢

Get a line quote

Scroll to Top