About AIPAK
We Build Complete Production and Packaging Lines for Supplement Manufacturers
Counting and bottling, softgels, gummies, stick packs and cartoning — built in China, tested with your product before it ships, and supported by a U.S. phone line answered by our own team.
About AIPAK
After the Line Leaves Our Plant
What happens between the FAT and your line running on your floor.
What Ships With Every Line
An operating manual in English, the FAT report run on your product, material certificates for product-contact parts, and a spare parts list. A kit of wear parts ships in the crate with the line.
Commissioning and Training
Our engineer installs and commissions the line in your plant and trains your operators until they can run it themselves. It’s a paid service, and the fee is stated in your proposal.
Support From a Distance — Honestly
We don't have a U.S. warehouse or local technicians. We do have a U.S. number, +1 (213) 526-8644, answered by our engineers 9 AM–7 PM China time, Monday to Friday. That's evening and overnight in the U.S., so leave a message or send a WhatsApp anytime and we'll pick it up first thing. When something stops, we work through it with you on a video call. Lead times for parts outside the kit are written into your quote.
The Lines We Build
Each line is configured around your product, your container and your output. Every machine in it is also available on its own.
Unscrambling, counting, desiccant, capping, induction sealing and labeling — for tablets, capsules, softgels and gummies.
Gel melting, fill prep, encapsulation, drying and inspection. We train your operators during commissioning, and a standard gel formula comes free.
Cooking, depositing, cooling and demolding, from 80 to 600 kg per hour. Gelatin, pectin or carrageenan, with a formula if you don’t have one.
Powders and granules into sticks, sachets and premade pouches, with cartoning behind them.
What You Get When You Buy From Us
How a Project Runs
From your first email to your line running on your floor.
01
Tell Us What You’re Making
Your product, container, count or fill weight, and target output. Photos and samples help.
02
We Test Your Product
We run your samples on the machine and send you the video and the data, so you see results before you see a quote.
03
Proposal and Layout
You get a line configuration and a layout drawn to your room — length, width, height, doors and columns.
04
Build
We build the line in Wuhan and wire it for your U.S. power supply: 208 V or 480 V, 60 Hz.
05
Factory Acceptance Test
We run the finished line with your product before it ships. Watch it on video or visit in person, by appointment.
06
Crating and Shipping
Export crates, container loading and the documents packed with each crate. Ocean freight to a U.S. port usually takes about four weeks.
07
Commissioning and Training
Our engineer installs and commissions the line in your plant and trains your operators. It’s a paid service, and the fee is stated in your proposal.
08
Documents and Spare Parts
An operating manual in English, the FAT report, material certificates for product-contact parts and a spare parts list ship with the line, along with a kit of wear parts.
Tell Us What You’re Making
An engineer reads every inquiry and replies within one business day.